Project Description

Area Coverage

Four Bedroom Flat, Central London

This combination boiler & pipework installation job promised to be a challenge to our team as space was limited meaning that precise calculation of pipework was required and pipework was installed before the boiler was, for this same reason. A high performance combination boiler was required as the property was a 4 bedroom flat with high demand, as there were 2 bathrooms, a large kitchen and several radiators. This combination boiler & pipework installation project was a success and completed on time and the customer was extremely happy with the work.